| Civil Projects Executed by Esaco 1984 – 2009 |
 |
| CLIENT |
WORK DESCRIPTION |
Year |
 |
| WNCC Wadi El Nile |
5000tpd Cement Project Beni Suef Egypt |
2009-2010 |
 |
| Asec Cement/F.L.Smidth |
4500tpd Djelfa Cement Plant Djelfa – Algeria |
2009-2010 |
 |
| TCDRI / GOE |
4500tdp line for Al Arish Cement Plant |
2008-2009 |
 |
| Al Ezz |
Ceramic Plant Sadat City |
2008-2009 |
 |
| Fcb-ciment / Titan-Lafarge |
4000tpd Line 2 for Beni Suef Cement Co. |
2008 |
 |
| Arabian Cement Co. Suez |
6000tpd Clinker plant for |
2006-2007 |
 |
| Cargill (USA) |
National Vegetable Oil Co. NVOC 3mil.tpy oil extraction plant Borg el Arab |
2004-2005 |
 |
| ABB Susa |
Water & Waste water treatment plants. Alex,-Minya-Beni Suif-Fayoum limited scope. |
2003 -2004 |
 |
| Dreamland (Dr. Ahmed Bahgat) |
Main contractor phase 2, |
2002 to present |
 |
| Foster Wheeler (France) |
Amoc Lube oil plant (Alexandria petroleum) |
2001 |
 |
| ANSDK |
Flat-steel utility project, service centre & pickling line in conjunction with Niigata Japan and Pro-Eco Canada |
1998-2000 |
 |
| Messer Griesheim DK |
Air separation plants, with Linde USA (Lotepro). |
1998 |
 |
| Buhler(Swiss) |
Five star flower mills Suez phase1 flour mill/Silo plant. |
1997 |
 |
| ANSDK |
waste water treatment plant |
1997 |
 |
| Technip(Italy) |
Sanitary-ware plant Yanbu Saudi-Arabia |
1996 |
 |
| Dreamland (Dr. Ahmed Bahgat) |
Phase 1 main contractor |
1996-2002 |
 |
| ANSDK(Egypt) |
Several civil jobs |
1996 |
 |
| Linde .AG(Germany) |
Air separation plant turn-key for Alexandria National Iron & Steel Co. ANSDK Dekheila, |
1994-1995 |
 |
| Geilinger(Swiss) |
Limited scope spinning & weaving plant Tripoli, Libya |
1993 |
 |
| Georg-Fischer (+GF+) |
Limited scope El-Nasr casting steel plant Alex |
1993 |
 |
| Geilinger (Swiss) |
Rehabilitation on ready made goods store and processing halls Misr el Amria spinning and weaving complex Alex. |
1992 |
 |
| Technip (Italy) |
PVC compounding plant EGPC |
1990-1991 |
 |
| Sadelmi Cogepi (Italy) |
Limited scopes in Damanhour, Damietta & Cairo South power plants |
1989 |
 |
| Technip (Italy) |
Boiler plant for EGPC |
1987-1988 |
 |
| ABB (Switzerland) |
Combined cycle power plant for Egyptian petrochemical company EGPC, in consortium with Sulzer and Geilinger Winterthur. |
1984-1986 |